8.5m Dia Tank Lifting Calculation

The purpose of this analysis is to verify the integrity of the whole tank during lifting and transportation to the site for installation.

The loading is considered for this tank as per API 650 ED 13. March 2020.

The software used for this FEA analysis is Solidworks Simulation Premium.

The rules and regulations of the following authority have been used in this mechanical design adequacy.























Comments

Popular posts from this blog

FRP DUCTING DESIGN FEA SUMILATION